How long does printing take? Lead times per product

In short

From two weeks for paper straws to eleven weeks for paper carrier bags. One overview, what starts the clock, and what to do when the date is tight.

By The Branding Club editorial team

How long does printing take? Lead times per product

Lead time is the question before every order, and the reason orders start too late. Below are the lead times of all The Branding Club's custom printed products as they appear in the order platform (price level October 2026), sorted from fast to slow. Every lead time counts from your proof approval, not from your enquiry.

The overview

Lead timeProducts (minimum order)

from 2 weeks

Paper straws (5.000 pcs)

from 3 weeks

Toothpicks (50.000 pcs); square coasters, printed 1 side (500 pcs)

from 4 weeks

Creamer sticks (12.000 pcs); champagne flutes (24 pcs); plates (24 pcs)

from 5 weeks

Wine, beer and longdrink glasses, glass bottles, tea glasses, coffee cups, mugs (24 to 36 pcs); reusable to-go cups and festival cups (250 pcs); refreshing towels (6.000 pcs); pizza carrier bag (1.000 pcs); snack trays (5.000 pcs); ice cream cups (5.040 pcs); catering boxes (1.000 pcs); greaseproof paper 20×20 cm small run (500 pcs); point-to-point cutlery napkin (12.000 pcs); coasters printed 2 sides, round Ø 107 mm and square (500 to 5.000 pcs)

from 6 weeks

Aprons, T-shirts, polos, sweaters, hoodies, chef jackets (from 1 pc); tumblers, beer mugs, whisky and shot glasses, jugs and carafes (24 pcs); chopsticks (5.000 pcs); bamboo napkins 40×40 cm line 1 (4.000 pcs); paper carrier bag 22×10×30 cm (12.800 pcs)

from 7 weeks

Cutlery pouches with tissue napkin (9.600 pcs); round coasters Ø 103 mm (500 to 1.200 pcs); sugar sachets (12.000 pcs); snack bags, cone bags and burger bags (14.400 to 36.000 pcs); luxury paper bag (250 pcs); skewers and wooden cutlery (1.000 pcs); sauce cups (50.000 pcs); food buckets (10.000 pcs); cold cups rPET (2.000 pcs)

from 8 weeks

Coffee cups, single- and double-wall (1.000 pcs); airlaid napkins (4.800 to 18.000 pcs); tissue napkins (9.600 to 40.000 pcs); bamboo napkins 48×48 cm (4.000 pcs); greaseproof paper, all sizes (10.000 to 55.000 pcs); burger boxes and fry trays (5.000 pcs); milkshake cups (9.000 pcs); pocket-fold cutlery napkin (4.800 pcs)

from 9 weeks

Cotton napkins with logo print (7.200 pcs); pizza boxes (10.500 pcs); salad bowls (2.100 pcs); cutlery pouches with airlaid napkin (13.650 pcs)

from 10 weeks

Luxury cutlery napkin with band (6.000 pcs); cutlery pouch 8,5×20 cm (12.480 pcs)

from 11 weeks

Paper carrier bags 26 to 32 cm, flat handles, twisted cord and without handles (11.200 to 16.000 pcs); noodle boxes (10.000 pcs); bamboo napkins 40×40 cm line 2 (15.000 pcs)

on request

Made-to-measure shipping boxes, canvas tote bags, pizza storage box, coffee cup sleeves

Standard lead times from the order platform, price level October 2026, counted from your proof approval. Every product page shows its own lead time; that one applies. The exact delivery date is in your quote.

See the lead time of your product

Every product page shows lead time, minimum and member price side by side. Membership is free.

What starts the clock

Not your enquiry, but your proof approval. The sequence is: you pick the product and quantity in the configurator and send it to your Brand Ambassador; you receive a quote with member prices; our designers turn your logo into a print-ready file and you see a proof of the product as it will be printed, folded and all. Only when you approve that proof does the order go to the production line and the lead time start running. If you want speed, supply a vector file and approve the proof the same day.

Why glass is faster than paper

Glassware is printed or engraved piece by piece, from 24 pieces, and arrives in four to six weeks. Napkins, cups, greaseproof paper and packaging run on production lines that are set up per design and run in large quantities; that is where the eight to eleven weeks come from. Paper carrier bags and noodle boxes have the longest lead times. So plan an opening backwards from the date: order the products with the longest lead time first. How to do that is in planning a launch.

When the date is tight

  • Rush production is available on request, at cost, usually 10 to 15% extra, and only if you choose it. Your Brand Ambassador confirms date and surcharge before you decide.
  • Pick a fast product for the first week. Glasses and coasters arrive in three to six weeks; napkins and cups follow.
  • Pro members get priority in production, one to two weeks faster. You reach that tier automatically as you order more; you do not pay for it.

Re-orders: 48 hours

The lead times above apply to a first run. After that we store your run and a call-off ships within 48 hours. When the run is used up you re-order in Clubhouse with the same approved proof; for that new run the product's lead time applies again. So plan the re-order as soon as your stock is at a quarter and you will not notice the difference.

Christmas: count back from 11 December

The Christmas page counts back per product from 11 December, the day everything has to be in house. For products with an eight-week lead time, such as airlaid napkins and coffee cups, 16 October 2026 is the last day for your proof approval. Glassware with four to five weeks can run into November. The Christmas page shows the last day per product; your quote names the exact delivery date.

Everything in one place

Every product page shows its own lead time next to price and minimum; all products are on one page. The largest groups: napkins from eight weeks, cups from five weeks (reusable) or eight weeks (paper), glasses from four weeks.

Frequently asked questions

Does the lead time count from my enquiry?

No, from your proof approval. Before that come the quote, making your file print-ready and the proof; the sooner you approve the proof, the sooner the clock runs.

What is the fastest custom printed product?

Paper straws from two weeks, then toothpicks and square coasters from three weeks and champagne flutes and plates from four weeks. Workwear and aprons are available from one piece in six weeks.

Can it be faster than the lead time on the product page?

Rush production is available on request, at cost, usually 10 to 15% extra. Your Brand Ambassador confirms date and surcharge before you decide.

See the lead time of your product

Every product page shows lead time, minimum and member price side by side. Membership is free.